ci(bindings-rust): update build_fedora job #91
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
bindings-rust.yml
on: push
Matrix: Fedora
Matrix: MacOS
Matrix: Ubuntu
Matrix: Windows
Annotations
8 errors
Windows (1.69)
Process completed with exit code 1.
|
Windows (1.70.0)
The job was canceled because "_1_69" failed.
|
Windows (1.70.0)
The operation was canceled.
|
Windows (1.68)
The job was canceled because "_1_69" failed.
|
Windows (1.68)
The operation was canceled.
|
Fedora (1.69)
Canceling since a higher priority waiting request for 'binding-rust-refs/heads/feat/support-wasi-socket-0.4.0' exists
|
Fedora (1.70.0)
Canceling since a higher priority waiting request for 'binding-rust-refs/heads/feat/support-wasi-socket-0.4.0' exists
|
Fedora (1.68)
Canceling since a higher priority waiting request for 'binding-rust-refs/heads/feat/support-wasi-socket-0.4.0' exists
|