Skip to content

chore: upgrade to RN 0.76.0-rc.1 #978

chore: upgrade to RN 0.76.0-rc.1

chore: upgrade to RN 0.76.0-rc.1 #978

Triggered via pull request September 19, 2024 23:12
Status Failure
Total duration 3m 4s
Artifacts

test.yml

on: pull_request
Matrix: verify
Fit to window
Zoom out
Zoom in

Annotations

8 errors
verify (20, ubuntu-latest)
tester-app#test: command (/home/runner/work/repack/repack/apps/tester-app) /home/runner/setup-pnpm/node_modules/.bin/pnpm run test exited (1)
verify (20, ubuntu-latest)
Process completed with exit code 1.
verify (22.6, ubuntu-latest)
The job was canceled because "_20_ubuntu-latest" failed.
verify (22.6, ubuntu-latest)
tester-app#test: command (/home/runner/work/repack/repack/apps/tester-app) /home/runner/setup-pnpm/node_modules/.bin/pnpm run test exited (1)
verify (22.6, ubuntu-latest)
Process completed with exit code 1.
verify (18, ubuntu-latest)
The job was canceled because "_20_ubuntu-latest" failed.
verify (18, ubuntu-latest)
tester-app#test: command (/home/runner/work/repack/repack/apps/tester-app) /home/runner/setup-pnpm/node_modules/.bin/pnpm run test exited (1)
verify (18, ubuntu-latest)
The operation was canceled.